Skip to main content

Our fine woodworking division is moving to join our main campus in Farmington, NY. They’re making their home in our Cross Laminated Timber (CLT) building (the first complete CLT in New York State) and in the office/showroom.

 

The NEWwoodworks crew on CLT raising day this past January.
The NEWwoodworks crew on CLT raising day this past January.

 

After a harsh winter in 2015 laid down an overabundance of snow and ice, this team’s shop collapsed. The WWII era bowstring trusses couldn’t take the heavy load. Seeing this as an opportunity to build a new space with all the right materials, as well as bring the team to the main campus, our CLT building came together.

 

This is the woodworking half of our CLT building before mechanicals and equipment have been loaded.
This is the woodworking half of our CLT building before mechanicals and equipment have been loaded.

 

Today, it’s ducted, sprinklered, wired, and nearly full with all the tools that allow this team to create masterpieces. As they move in, and before the sawdust starts to fly, we thought you might like a sneak-peek at the progress.

 

The extensive remodel of a well-loved 1980’s family home is complete. An overhaul of exterior materials and addition of spaces updated and reinvigorated the home aesthetically and functionally. 

 

s

 

s

 

What began this timber revolution? The timber frame boat shelter, a favorite and iconic part of this effort.

 

The boat shelter that started it all!
The boat shelter that started it all!

 

As viewed from the new porch on the main home.
As viewed from the new porch on the main home.

 

A new garage and breezeway made strides toward accessible living while a refreshed porte cochere showcases what we affectionately call our “everything” truss for this remodeled home.

 

On New Years Day, 2015 a devastating fire claimed the St. Pius X Church in the Town of Chili, New York. As church leaders and hundreds of parishioners gathered the resounding desire was to rebuild. Fast forward to December 2016, and after raising the necessary funding to rebuild, the church’s future took shape. Hanlon Architects designed a large, open interior volume with visible timber framing. Working closely with Hanlon and the Nichols Construction Team, our timber frame engineering team applied their know-how to refine and finalize the timber truss design.

s

 

s

 

“With a 36’ clear center aisle, supported with hammer beam style trusses and 33’ long keyed beam rafters to support the flanking shed roofs, this is truly going to be a magnificently expansive space for many to enjoy,” shared Bryan Bleier, timber frame engineering project leader for the St. Pius X roof system.

 

s

 

Follow Us On Instagram